[Comtec Announce] [Comtec House] Maintenance window 15th May 2015

David Croft david at comtec.net.uk
Fri Apr 17 19:16:04 BST 2015


Please be advised of the following maintenance window scheduled on the
electrical supply at Comtec House:

Date: Friday, 15th May 2015
Start time: 19:30 BST (UTC+0100)
End time: 22:30 BST (UTC+0100)

Purpose

Scheduled testing of electrical systems.

The building black test is carried out on a biannual basis to test the
generators' capability in supporting the building electrical
infrastructure in the event of a power failure to the building.

This test involves interrupting utility power to the building and
allowing the generators to take the full building load for a 2 hour
period during this window.

Impact

LOW

No impact is expected from this routine testing. UPS systems will take
the load during switchover. In the event of any unforeseen problems,
UPS systems will take the load while utility power is restored.

Services hosted at Comtec House are "at risk" during this window.

Regards,

David Croft

-- 
David Croft
Lead Engineer

Comtec Enterprises Ltd
Comtec House
46a Albert Road North
Reigate Industrial Estate
Reigate
Surrey RH2 9EL

Tel: 0845 899 1400
Fax: 0845 899 1401
www.comtec.com

For urgent operational issues please always contact noc at comtec.com
or 0845 899 1423 and not any named individual.


More information about the UK-Announce mailing list